A logistics hall first sets racking or floor stacking, vehicle type and whether docks are reserved. Low clearance blocks later racking; an unset dock moves doors and canopies. These belong in the scheme, not after shop drawings.
A tight grid blocks aisles; a very wide grid raises steel use. Review it with the logistics planner. Leave the first-phase gable ready if an extension is likely.

Send size, floor type, doors and loading method. Area without height only supports a rough guess, not settlement tonnage.
Attach a sketch or racking note. Ask cladding and drainage with the grid.
Tiankai Southeast fabricates marked members from approved drawings and supports erection by mark number. Sizes, loads and delivery follow the confirmed design file and contract; this page does not turn uncalculated tonnage, thickness or time into a promise.