Why Erection Usually Starts with Columns and a Stable Bay | Wind and Roofing

Why Erection Usually Starts with Columns and a Stable Bay | Wind and Roofing

Construction Guide Author:天凯东南 Published:2026-08-24

A common order is columns, beams, braces, then purlins and cladding, but the erection plan governs. A stable bay is formed first so later roof members are not free-standing in the wind.

Members that do not yet form a stable system need temporary guys. Sequence changes need the site engineer. Mirrored pieces need the suffix, not length only.

Why Erection Usually Starts with Columns and a Stable Bay | Wind and Roofing

Clad after alignment. Bolt tightening and coating touch-up are common handover items; the contract list governs.

This is a sequence note, not a safety plan, and it invents no client or tonnage.