Foundations and bolts should be checked before the erection crew arrives. Laydown should be zoned by mark so early pieces do not bury later ones. Weak access keeps long beams off site.
Night or closed sites need a written work window. Airports, campuses and live plants often cannot assume continuous work.

Power, exclusion zones and unloading gear belong on the arrival list. Missing one item often means the day ends at the packing list.
This is a reminder, not a safety plan. State site limits in the inquiry so the interface can be judged.