Temporary brace locations and removal times belong in the erection plan. Until permanent braces exist, wind and lifting eccentricity can unsettle the frame. Height work, crane radius and exclusion zones follow site rules, not this page.
Members that are not yet a stable system need the planned guys. Removing braces to save time is a common risk and needs the site engineer.

This article is a reminder, not a substitute for the project safety plan, and it invents no lift weight or crew size.
State site-closure and the work window in the inquiry. Safety always follows the project file.
Tiankai Southeast fabricates marked members from approved drawings and supports erection by mark number. Sizes, loads and delivery follow the confirmed design file and contract; this page does not turn uncalculated tonnage, thickness or time into a promise.
Tiankai Southeast fabricates marked members from approved drawings and supports erection by mark number. Sizes, loads and delivery follow the confirmed design file and contract; this page does not turn uncalculated tonnage, thickness or time into a promise.