The handover list follows the contract and code; this article only names common items: grid, level, final bolt records and coating touch-up. Joints without records should be rechecked before takeover.
Unfinished civil and M&E work should stay on the interface list. Grout, roof opening stiffening and clear gutters often start later leak disputes.

Archive mark drawings, change notes and shipping papers together. Spoken extras without a written record rarely match the packing list later.
This is a handover reminder, not the acceptance code, and it invents no unpublished test ratio.
Tiankai Southeast fabricates marked members from approved drawings and supports erection by mark number. Sizes, loads and delivery follow the confirmed design file and contract; this page does not turn uncalculated tonnage, thickness or time into a promise.
Tiankai Southeast fabricates marked members from approved drawings and supports erection by mark number. Sizes, loads and delivery follow the confirmed design file and contract; this page does not turn uncalculated tonnage, thickness or time into a promise.