Check the packing list before spreading pieces, then stack by grid line. Mirrored pieces need the suffix, not length only. Similar purlins also go wrong if the yard is not zoned.
If a piece is missing, stop that bay; do not borrow from the next bay. Extras need a written change and an updated packing record.

Keep over-length and fragile pieces apart. Record damaged packing on arrival, not on the lift day.
This page only reminds the matching habit. Marks follow that job’s shop drawings.
Tiankai Southeast fabricates marked members from approved drawings and supports erection by mark number. Sizes, loads and delivery follow the confirmed design file and contract; this page does not turn uncalculated tonnage, thickness or time into a promise.
Tiankai Southeast fabricates marked members from approved drawings and supports erection by mark number. Sizes, loads and delivery follow the confirmed design file and contract; this page does not turn uncalculated tonnage, thickness or time into a promise.