Airport steel is detailed after a master plan and aviation process. Clear height, apron flow and working hours limit lifting, unlike a plant that can work continuously. Joints near public areas also need a different finish.
Plant joints rarely pass review on a terminal roof or hangar door. Lifting windows may need their own temporary works.

Official news named Phase II of Jinan Yaoqiang Airport; unpublished lots and tonnage are omitted.
Attach master-plan data, height limits and site-closure notes. Without them only the system type can be discussed.
Tiankai Southeast fabricates marked members from approved drawings and supports erection by mark number. Sizes, loads and delivery follow the confirmed design file and contract; this page does not turn uncalculated tonnage, thickness or time into a promise.