The official headline names steelworks for Phase II of Jinan Yaoqiang Airport. Unpublished lots, steel weight, joints and programme are omitted so a news line is not turned into a copy-ready airport drawing.
Airport steel follows a master plan, clear height and a closed site; lifting windows may be limited. Plant-frame joints should not be reused on a terminal or apron building.

Send location, height limits and working hours with an airport inquiry. Without a master plan only a rough talk is possible.
Fabrication follows that project file. Certificates or awards not published officially stay off this page.
Tiankai Southeast fabricates marked members from approved drawings and supports erection by mark number. Sizes, loads and delivery follow the confirmed design file and contract; this page does not turn uncalculated tonnage, thickness or time into a promise.