Aircraft Hangar Steel for Clear-Span Maintenance Space

Steel Structure Airport Buildings

A hangar scheme driven by clear height, doors and hanging loads, not by treating a plant span as a hangar span.

A hangar needs clear space and large doors. The roof may be a grid, truss or portal, but aircraft size and maintenance come first—not the system that merely “looks wide”. Hanging loads, bridge equipment and towing paths belong in the scheme.

Send the plan, clear height, door width and operation, and any crane or platforms. Add master-plan and closed-site limits. Without aircraft or process sizes, only the system type can be discussed.

Aircraft Hangar Steel for Clear-Span Maintenance Space

Shop and erection differ from a plant; the lifting window may be short. Unpublished span and door height are not invented.

Airport steel is in the product line, but the project file governs. Attach master-plan and clear-height data.

Tiankai Southeast fabricates marked members from approved drawings and supports erection by mark number. Sizes, loads and delivery follow the confirmed design file and contract; this page does not turn uncalculated tonnage, thickness or time into a promise.

  • Give aircraft and door sizes first
  • Put hanging and towing in the scheme
  • Plan the lifting window separately

Specifications

Space Long-span hangar
Door By aircraft
Hangers By process
Others Apron and MRO extra

Related products

FAQ

  • Do you support site erection?

    Our core work is shop fabrication and delivery. We can supply erection drawings, piece marks and remote technical support. If you need a supervisor or erection assistance, state the programme and site conditions in the inquiry; we will assess it per project.

  • Which design software and drawing formats do you accept?

    Design and detailing follow the drawing set agreed for each project. Please send plans, elevations, sections, plus load, span, bay spacing and cladding requirements. PDF or common CAD formats are acceptable. A sketch or dimension list is enough for a first scheme before shop drawings.

  • How are wind and snow loads decided?

    Wind and snow loads follow the project location, the local code and the owner design brief. There is no single default number. Please provide site, basic wind pressure, snow load, seismic data and roof live load. A first estimate can use the stated building use; fabrication follows approved drawings only.

  • How is export container loading arranged?

    Export jobs can be loaded at the plant or warehouse. Members are packed by mark for site matching. Container type and quantity depend on span, member length and packing. Please state the destination port and whether inland haulage is required. Insurance and destination clearance follow the trade terms.

  • Can the building be expanded later?

    Expansion is easier if bay spacing, gable conditions, crane or mezzanine loads are reserved in the first scheme. Please say whether a future extension, crane or mezzanine is planned. A building without reserves can still be modified, but foundations and existing members must be rechecked.

Send an inquiry