2026-08-24 Profiled Sheet or Sandwich Panel for Export Plants | Packing and Equivalents How insulation, fire, ocean packing and local supply affect the envelope choice on an export steel hall.
2026-08-24 What Shop Drawings and Mark Numbers Are For | Packing and Changes Shop drawings turn the design into cut, pack and match instructions; changes must stop before cutting.
2026-08-24 How Airport Steel Differs from Plant Steel | Master Plan and Closed Site Clear height, joint appearance, a closed site and the master plan stop airport steel from reusing plant drawings.
2026-08-24 71 m Steel Pedestrian Overpass Update | Official Q345QD Note A restatement of the 2026-08-21 official note on an about 71 m overpass and Q345QD; that span must not be copied into a new inquiry.
2026-08-24 Drawings You Should Prepare for a Steel Inquiry | Plan, Height and Loads Plans, eave or storey height, doors, the roof build-up and main loads cut scheme rounds.
2026-08-24 Large-Diameter Tube Column Update | Official Process Boundary The 2026-08-01 official update and the published university project name are kept; unpublished diameter and wall thickness are omitted.
2026-08-24 How to Read Common Steel Grades in an Inquiry | Code and Design File A grade must be read with the design file, welding and local code, not as a single slogan.
2026-08-24 When a Space Grid Beats a Portal Frame | Hall Roof Choice Why a grid or truss fits irregular or long-span halls better than a portal frame, and why a plan must come first.
2026-08-24 Why Purlins and Wall Rails Must Stay on the List | Envelope Fixing Secondary members fix the envelope and drainage; omitting them from the frame price causes site extras.