Offices need regular bays, ceiling height and a street facade. Steel can close floors quickly, but stairs, lifts, wet set-downs and curtain-wall embeds belong in the first scheme. Plant beams usually fight the ducts upstairs.
Send storeys, height, plan and the code. Mark exposed steel and canopies. Without a code the reply stays at scheme level.

Erection follows the slab. Colour and exposed joints go on the approval set. Unpublished area and cost are omitted.
Attach a plan and say whether floors and cladding are included.
Tiankai Southeast fabricates marked members from approved drawings and supports erection by mark number. Sizes, loads and delivery follow the confirmed design file and contract; this page does not turn uncalculated tonnage, thickness or time into a promise.
Tiankai Southeast fabricates marked members from approved drawings and supports erection by mark number. Sizes, loads and delivery follow the confirmed design file and contract; this page does not turn uncalculated tonnage, thickness or time into a promise.
- Fix height, bays and embeds
- Mark exposed steel
- Erect with the slab