Airport steel may be an ancillary hall, hangar or long-span roof. It differs from a plant in the master plan, clear height, joint appearance and a closed site. Lifting windows may need their own plan.
Attach master-plan data, height limits and working hours. Official news named Phase II of Jinan Yaoqiang Airport; unpublished lots and tonnage are omitted.

Choose the system after the plan and aviation process. Fabrication follows that project file.
Send an airport inquiry with master-plan data. Without it, only a rough talk is possible.
Tiankai Southeast fabricates marked members from approved drawings and supports erection by mark number. Sizes, loads and delivery follow the confirmed design file and contract; this page does not turn uncalculated tonnage, thickness or time into a promise.
Tiankai Southeast fabricates marked members from approved drawings and supports erection by mark number. Sizes, loads and delivery follow the confirmed design file and contract; this page does not turn uncalculated tonnage, thickness or time into a promise.
- Read the master plan before the system
- Put operations limits on lifting
- Do not reuse plant drawings