Hangar doors, height and crane radius usually exceed a plant. Access and crane pads must follow door swing and equipment routes, not a workshop habit.
The work window may be limited and should be written. Large cantilevers or door posts need the planned temporary works before the system is stable.

Unpublished door width and span are omitted. Official airport news is repeated only as published headlines.
Attach master plan, clear height and door data.
Tiankai Southeast fabricates marked members from approved drawings and supports erection by mark number. Sizes, loads and delivery follow the confirmed design file and contract; this page does not turn uncalculated tonnage, thickness or time into a promise.
Tiankai Southeast fabricates marked members from approved drawings and supports erection by mark number. Sizes, loads and delivery follow the confirmed design file and contract; this page does not turn uncalculated tonnage, thickness or time into a promise.
- Check pads against doors and height
- Confirm the work window in writing
- Do not invent door width