Before arrival, lock whether the job is a sealed store, an open shed or a washed house; coating cannot change on site. Open sheds see different uplift and need different temporary works.
Match marks, then follow the open side and vehicle path. Wet-area bases and column surrounds follow the drawing so wash water does not sit on bare cuts.

Unpublished house spans and flock sizes are omitted. Materials follow the contract schedule.
State use and exposure; do not write only “build a shed”.
Tiankai Southeast fabricates marked members from approved drawings and supports erection by mark number. Sizes, loads and delivery follow the confirmed design file and contract; this page does not turn uncalculated tonnage, thickness or time into a promise.
Tiankai Southeast fabricates marked members from approved drawings and supports erection by mark number. Sizes, loads and delivery follow the confirmed design file and contract; this page does not turn uncalculated tonnage, thickness or time into a promise.
- Lock open or sealed before arrival
- Protect wet-area details
- Put exposure in the inquiry